From the preparation plant, coal is transported by truck to one of two clean coal loadout and storage areas for coal to be shipped on the Norfolk Southern railroad. Coal is stacked via one of four 2,500 tons per hour stacking tubes and stacked into one of four storage areas, two with capacity of 15,000 tons and two with capacity of 10,000 tons.
Alternatively, coal is transported by truck to a loadout on the CSXT system where 10,000 tons can be stored prior to loading into railcars.
The three mines operate in the Upper and Lower Cedar Grove seam, the Williamson Seam, and the #2 Gas seam and work two shifts, five or six days per week.
All mines utilize conventional room and pillar mining with continuous mining machines. In general, super sections are utilized to attain maximum production. Coal is transported to the surface via belt conveyor and either conveyed or trucked to the coal preparation plant.